Rough Order of Magnitude
Estimates Made Simple at

Snic Speed

Generate comprehensive industry standard technical proposals with accurate effort, cost, and schedule estimates — all in one place.

Everything you need to create simple and clear technical proposals
based on industry standards language

Proposal Generation

Automatically generate comprehensive technical proposals from your project parameters.

Cost Estimation

Document-based and requirements-based formulas for accurate effort and cost projections.

Schedule Planning

Convert effort estimates into notational project timelines with resource allocation.

DO-178

Software Guidelines

The DO-178 provides guidance for determining, in a consistent manner and with an acceptable level of confidence, that the software aspects of airborne systems and equipment comply with airworthiness requirements. The DO-178 is the primary document by which the certification authorities such as FAA, EASA and Transport Canada approve all commercial software-based aerospace systems.

DO-254

Hardware Guidelines

The DO-254 is intended to help aircraft manufacturers and the suppliers of aircraft electronic systems assure that electronic airborne equipment safely performs its intended function. The document identifies design life cycle processes for hardware that includes line replaceable units, circuit board assemblies, application specific integrated circuits (ASICs), programmable logic devices, etc.

ARP-4754

System Guidelines

The ARP-4754 provides recommendations for the development of aircraft and systems, taking into account aircraft functions and operating environment. It provides practices for ensuring the safety of the overall aircraft design, showing compliance with regulations, and assisting a company in developing and meeting its own internal standards.

ARP-4761

Safety Guidelines

The ARP-4761A presents guidelines for performing safety assessments of civil aircraft, systems, and equipment. They may be used when addressing compliance with certification requirements (e.g., 14 CFR/CS Parts 23, 25, 27, and 29 and 14 CFR Parts 33, 35, CS-E, and CS-P). ARP4761A may also be used to assist a company in meeting its own internal safety assessment standards.